A small firm produces both AM and AM/FM car radios. The AM radios take 15 h to produce, and the AM/FM radios t
A small firm produces both AM and AM/FM car radios. The AM radios take 15 h to produce, and the AM/FM radios take 20h. The number of production hours is limited to 300 h per week. The plant’s capacity is limited to a total of 18 radios per week, and existing orders require that at least 4 AM radios and at least 3 AM/FM radios be produced per week. Write a system of inequalities representing this situation. Then, draw a graph of the feasible region given these conditions, in which x is the number of AM radios and y the number of AM/FM radios.